Certifications, stated and filterable
API specifications, ISO, safety programme registrations and insurance levels. Supply chain teams screen on these first, and having them buried in a PDF is functionally the same as not having them.
An operator's supply chain team decides whether you are on the list before anyone at your company knows they were looking.
Energy and oilfield website design in Houston costs $7,000 to $50,000. The buying process here starts with qualification rather than interest: certifications, safety record, insurance, equipment specifications and previous scope are checked before any contact, so the site's job is to survive a screen it never sees.
API specifications, ISO, safety programme registrations and insurance levels. Supply chain teams screen on these first, and having them buried in a PDF is functionally the same as not having them.
HSE statistics, programme detail and incident performance. In this sector it is a qualification criterion rather than a marketing message, and companies that publish it get shortlisted by companies that check.
Ratings, dimensions, materials, pressure and temperature ranges, service classes. Structured on the page and filterable rather than trapped in a brochure that was designed for print in 2016.
Operators and EPCs think in service categories and scopes of work. Describe what you do in their language rather than in yours, or the person screening you cannot map you onto the requirement.
Basins, offshore and onshore, regions and any international footprint. Vague geography reads as unable to commit, and it wastes both sides' time when it turns out you do not cover the field.
Energy hiring runs hot and cold and moves fast when it turns. A careers section with real content about the work, the rotations and the equipment does more than a job board listing does.
| Project | Range (USD) | Timeline | What you get |
|---|---|---|---|
| Focused service company site | $7,000 to $15,000 | 4 to 8 weeks | Home, services, certifications, HSE, careers, contact, editable |
| Equipment and specification site | $15,000 to $30,000 | 8 to 16 weeks | Above plus structured product data, specifications, downloads, search |
| Larger or multi-division | $30,000 to $60,000 | 14 to 26 weeks | Division structure, catalogue at scale, integration, multi-region, migration |
| Equipment data project alone | $4,000 to $20,000 | 3 to 10 weeks | Extraction, structuring, specifications, certifications, ongoing sync |
| Qualification content package | $2,500 to $9,000 | 2 to 5 weeks | Certifications, HSE, insurance, scopes, structured for screening |
| Care plan | $300 to $1,800 per month | Ongoing | Updates, certifications, content, monitoring |
The single highest-return work on most energy sites is the qualification content, and it is usually the cheapest line on this table.
| Ask them | A good answer sounds like | Walk away if |
|---|---|---|
| How fast can our team publish a page? | Immediately, without a developer | Send it to us and we will add it |
| What happens when a connected system is down? | Retries, queues, alerts, defined behaviour | It will not be down |
| What would you tell us not to build? | A straight answer that costs them money | Everything on your list is essential |
| Can I see Core Web Vitals on three live sites? | URLs, and an honest word about the slowest | They show you portfolio shots |
Write the answers down. Six months in, nobody remembers what was said on a call.
| Problem | What it costs |
|---|---|
| Certifications only inside a PDF | Screened out before anyone contacts you |
| No HSE statistics anywhere | A qualification criterion left unanswered |
| Equipment specs in a print brochure | Nothing searchable, filterable or indexed |
| Services described in your own language | A screener who cannot map you to the scope |
| Vague geography | Wasted conversations about fields you do not cover |
| Careers page with listings and nothing else | Losing crews to companies that wrote something |
A focused service company site runs $7,000 to $15,000. An equipment and specification site runs $15,000 to $30,000. Larger multi-division sites run $30,000 to $60,000.
Qualification content. Certifications, safety record, insurance levels and scopes of work, structured so a supply chain team can screen you quickly. It is usually the cheapest work on the site and the highest return.
In this sector it is a qualification criterion rather than a marketing decision. Companies that publish HSE performance get shortlisted by companies that check, and the ones that stay silent are quietly assumed to have a reason.
In structured, filterable content on the page, with the documents available as well. API specifications, ISO and safety registrations buried in a PDF are functionally the same as not having them, because the screen happens before contact.
In the language operators and EPCs buy in: service categories and scopes of work. If the person screening you cannot map your description onto their requirement, you do not make the list regardless of capability.
Yes, as structured data driven from wherever it lives now rather than as hand-built pages. Where that data sits and what shape it is in is the first thing we scope, because it decides most of the build.
Meaningfully, particularly when the market turns and hiring moves fast. Real content about the work, rotations and equipment does more than a job board listing, and it is ready before you need it.
No. We work with Houston energy companies remotely on Central hours and would rather say that than imply otherwise. Not carrying local overheads is part of why our numbers differ.
Send us the current site and we will tell you what is worth fixing and what is not. We will tell you the parts we would not charge you for.